Become our distributor!

SKATEPARKS

Modular Skatepark - Pisz

Print

Modular Skatepark - Pisz

Address: ul. Juliusza Słowackiego

Technology: modułowa

Skatepark type: skatepark modułowy

Year: 2025

Skatepark elements: Quarter Pipe + Bank Ramp (651x2190x120/150 cm) – a powerful driving section. Funbox set (988x1398x20/40/60 cm) – the expansive heart of the skatepark with plenty of combinations for learning new tricks. Grindbox 9 (364x131x35 cm). Quarter Pipe (345x549x180 cm). Grindbox 12 + Streetwall (302x731x65/90/184 cm). Straight rail (400x5x40 cm). Bank ramp (360x244x120 cm). Funbox with grindbox 2/2 + Handrail 2/2 (540x515x45 cm). Quarter pipe (300x244x120 cm). Grindbox 3 (488x222x20/40 cm). Straight rail (400x5x30 cm).

Pisz has gained a whole new dimension to its skateboarding scene. At a spot well-known to local riders, we’ve installed a modern modular skatepark featuring our flagship “Prestige” finish. It’s a comprehensive facility designed with smooth flow and a wide range of training options in mind, for fans of both aerial tricks and technical street skating.

Facility design and equipment:

The skatepark in Pisz features a well-thought-out layout of features that encourages long sessions and creative line combinations. The space has been divided into zones to ensure the right riding dynamics.

The park features, among other things:

  • Speed section (quarter pipe & bank ramp): An impressive complex with a total width of over 20 meters. It serves as the main source of speed in the facility and allows skaters to build momentum for the central features, while also offering plenty of space for stalls, grinds, and tricks at various angles.

  • Main Platform: The central point of the skatepark, equipped with an extensive funbox featuring angled rails, grindboxes, and a pyramid. This section allows riders to practice a wide range of aerial and technical tricks. The setup is complemented by an additional, slightly lower funbox with a rail and a grindbox.

  • Extensive street zone: Fans of urban-style skating will find a long grindbox integrated with a 1.8-meter-high street wall, which ends with a quarter pipe for smooth turnarounds.

  • Additional platform: A section focused on refining technique, featuring lower grindboxes, a 4-meter pipe, and a funbox—ideal for practicing precise runs, manuals, and grinds.

Technology and Durability: The facility was built using the Prestige variant. This means that the riding surface of all elements is made of the highest-quality HPL laminate, which guarantees excellent traction, weather resistance, and a long service life (backed by a 5-year warranty on the surface). The entire facility blends perfectly with the smoothly troweled concrete surface, ensuring a quiet and comfortable ride.

Additional attractions:

The facility’s offerings are expanded by an integrated modular pump track built on a sturdy steel structure, which serves as a great supplement to coordination and balance training for the youngest riders and an excellent warm-up for experienced users.


See also: Made snowparks