Become our distributor!

SKATEPARKS

Concrete Skatepark - Wojkowice

Print

Concrete Skatepark - Wojkowice

Address: Janusza Kusocińskiego 1

Skatepark option: concrete

Technology: betonowa

Year: 2024

Skatepark elements: Street zone - more than 780 m² area with flat elements such as two grindboxes of different heights, a set of manual pads, stairs of different difficulty levels, combinations of grindboxes and handrails, curb and pyramids in several variations. Bowl - more than 280 sq m with a 150 cm deep bowl, elevations of up to 180 cm, a classic rise on the corner and a steep banked corner, conducive to dynamic riding. Pumptrack line - about 80 sq m, ending with a step-up, allowing you to safely perform tricks on the fly.

The skatepark in Wojkowice is a modern 1,144-square-meter sports facility, part of a larger recreational complex next to the city stadium. Designed with beginners and experienced users in mind, it has been divided into three main sections:

  • Street Zone - more than 780 m² area with flat elements such as two grindboxes of different heights, a set of manual pads, stairs of different difficulty levels, combinations of grindboxes and handrails, curb and pyramids in several variations.

  • Bowl - more than 280 sq m with a 150 cm deep bowl, elevations up to 180 cm, a classic rise on the corner and a steep banked corner, conducive to dynamic riding.

  • A pumptrack line - about 80 m², ending with a step-up, enabling safe performance of tricks on the fly.

The implementation of the investment included comprehensive work - starting with the development of a programmatic and spatial concept for the skatepark and pumptrack, through the preparation of a detailed structural design and material specifications and technical documentation, to the execution of the tender, cost estimate and construction works. All necessary elements, including the street workout set with foundations, were delivered and installed, industry supervision was provided for the progress of the work, patterns for making embankments and guidelines for earthworks were prepared, and material sheets required prior to construction were prepared. The culmination of the work was the preparation of regulations for the use of the skatepark, pumptrack and street workout zone. As a result, the facility became a modern, functional and safe space, perfectly complementing the city's sports and recreational offer.

See also: Made snowparks